This page contains BSP divisions 600 through 599 - Outside Plant, Test Center Operation, and Loop Assignment.
| Division | Description |
|---|---|
| 620 | Outside Plant, General |
| 621 | Pole Lines |
| 622 | Conduit, Manholes, and Cable Vaults |
| 623 | Open Wire |
| 624 | Multiple Wire |
| 626 | Cables, Wire, and Apparatus |
| 627 | Aerial, Block, and House Cable |
| 628 | Underground Cable |
| 629 | Buried Plant |
| 631 | Cable Terminals |
| 632 | Cable Splicing |
| 633 | Splice Closures |
| 634 | Electrical Cable Testing and Identification |
| 636 | Main Frame Terminations and Connectors |
| 637 | Cable Pressure Systems |
| 638 | Electrical Protection and Bonding |
| 640 | Outside Plant Carrier Apparatus |
| 642 | Dedicated Plant |
| 644 | Upkeep |
| 649 | Outside Plant Construction Equipment |
| 650 | Converged Stackable Switch (Post-Divestiture) |
| 660 | Test Center Operation |
| 662 | Cable and Local Test Desks and Local Test Cabinets |
| 664 | Testboards for Other Than Special Services |
| 666 | Testboards and Test Positions For Special Services |
| 667 | Switched Maintenance Access and Servicing Systems |
| 668 | Data Test Centers |
| 670 | VPNmanager (Post-Divestiture) |
| 680 | Loop Assignment Distribution Service |
| 682 | Plant Assignment Trunk Plant and Special Services |