Unable to load page tree. It seems that you do not have permission to view the root page.
Attachments
| Name | Size | Creator | Creation Date | Labels | Comment | |||
|---|---|---|---|---|---|---|---|---|
| PDF File 30-19F1_UIS_1972-10-23.pdf | 53 kB | Shaun Ewing | Oct 23, 1972 00:00 |
|
Erecting Frames - Shop Equipped Cable Duct Type Bays - Unequal Flange Upright Frames at Hoisting Center | |||
| Version 1 (current) | 53 kB | Shaun Ewing | Oct 23, 1972 00:00 | Erecting Frames - Shop Equipped Cable Duct Type Bays - Unequal Flange Upright Frames at Hoisting Center | ||||
| PDF File 30-6V_1972-08-31.pdf | 118 kB | Shaun Ewing | Aug 31, 1972 00:00 |
|
Laying Out Floors - Verification Outline | |||
| Version 1 (current) | 118 kB | Shaun Ewing | Aug 31, 1972 00:00 | Laying Out Floors - Verification Outline | ||||
| PDF File 30-6A_1972-08-31.pdf | 433 kB | Shaun Ewing | Aug 31, 1972 00:00 |
|
Laying Out Floors - Common Information, Requirements and Methods (Includes Specific Information for Common Systems Bays and Racks) | |||
| Version 1 (current) | 433 kB | Shaun Ewing | Aug 31, 1972 00:00 | Laying Out Floors - Common Information, Requirements and Methods (Includes Specific Information for Common Systems Bays and Racks) | ||||
| PDF File 30-19B1_1972-08-03.pdf | 344 kB | Shaun Ewing | Aug 03, 1972 00:00 |
|
Erecting Frames - Bulb Angle and Channel Type, With Sheet Metal Bases | |||
| Version 1 (current) | 344 kB | Shaun Ewing | Aug 03, 1972 00:00 | Erecting Frames - Bulb Angle and Channel Type, With Sheet Metal Bases | ||||
| PDF File 30-1C_1972-01-24.pdf | 77 kB | Shaun Ewing | Jan 24, 1972 00:00 |
|
Location, Erection and Assembly - Cross Reference Between BSP Figures and Handbook Sections | |||
| Version 1 (current) | 77 kB | Shaun Ewing | Jan 24, 1972 00:00 | Location, Erection and Assembly - Cross Reference Between BSP Figures and Handbook Sections | ||||
| PDF File 30-15B_1971-12-16.pdf | 581 kB | Shaun Ewing | Dec 16, 1971 00:00 |
|
Sheathing for Cable Holes and Slots and Floor Openings in Cable Ducts | |||
| Version 1 (current) | 581 kB | Shaun Ewing | Dec 16, 1971 00:00 | Sheathing for Cable Holes and Slots and Floor Openings in Cable Ducts | ||||
| PDF File 30-9_1971-12-16.pdf | 496 kB | Shaun Ewing | Dec 16, 1971 00:00 |
|
Drilling Holes in Masonry and Setting Expansion Shields and Anchors | |||
| Version 1 (current) | 496 kB | Shaun Ewing | Dec 16, 1971 00:00 | Drilling Holes in Masonry and Setting Expansion Shields and Anchors | ||||
| PDF File 30-12_1971-08-11.pdf | 134 kB | Shaun Ewing | Aug 11, 1971 00:00 |
|
Auxiliary Framing and Cable Rack - Temporary Support Using the R-4099 Adjustable Stanchion | |||
| Version 1 (current) | 134 kB | Shaun Ewing | Aug 11, 1971 00:00 | Auxiliary Framing and Cable Rack - Temporary Support Using the R-4099 Adjustable Stanchion | ||||
| PDF File 30-19V_1970-11-25.pdf | 305 kB | Shaun Ewing | Nov 25, 1970 00:00 |
|
Erecting Frames - Verification Outline | |||
| Version 1 (current) | 305 kB | Shaun Ewing | Nov 25, 1970 00:00 | Erecting Frames - Verification Outline | ||||
| PDF File 30-30A_1970-10-19.pdf | 1.10 MB | Shaun Ewing | Oct 19, 1970 00:00 |
|
Placing, Fastening and Aligning Switchboard Sections, Desks and Associated Parts - Common Requirements and Information | |||
| Version 1 (current) | 1.10 MB | Shaun Ewing | Oct 19, 1970 00:00 | Placing, Fastening and Aligning Switchboard Sections, Desks and Associated Parts - Common Requirements and Information | ||||
| PDF File 30-19D_1970-10-09.pdf | 3.61 MB | Shaun Ewing | Oct 09, 1970 00:00 |
|
Erecting Frames - 1A Card Translators (No. 4A Toll) | |||
| Version 1 (current) | 3.61 MB | Shaun Ewing | Oct 09, 1970 00:00 | Erecting Frames - 1A Card Translators (No. 4A Toll) | ||||
| PDF File 30-40F_1970-07-24.pdf | 99 kB | Shaun Ewing | Jul 24, 1970 00:00 |
|
Rolling Ladders, Brakes and Ladder Track - Portable Type Rolling Ladders | |||
| Version 1 (current) | 99 kB | Shaun Ewing | Jul 24, 1970 00:00 | Rolling Ladders, Brakes and Ladder Track - Portable Type Rolling Ladders | ||||
| PDF File 30-30B_1970-01-02.pdf | 737 kB | Shaun Ewing | Jan 02, 1970 00:00 |
|
Placing, Fastening and Aligning Switchboard Sections, Desks and Associated Parts - Nos. 3CL, 5, 607A and 607B Switchboards | |||
| Version 1 (current) | 737 kB | Shaun Ewing | Jan 02, 1970 00:00 | Placing, Fastening and Aligning Switchboard Sections, Desks and Associated Parts - Nos. 3CL, 5, 607A and 607B Switchboards | ||||
| PDF File 30-50A_1969-12-26.pdf | 163 kB | Shaun Ewing | Dec 26, 1969 00:00 |
|
Mounting Shelves, Units and Other Frame Mounted Equipment - Common Information | |||
| Version 1 (current) | 163 kB | Shaun Ewing | Dec 26, 1969 00:00 | Mounting Shelves, Units and Other Frame Mounted Equipment - Common Information | ||||
| PDF File 30-20V_1969-08-22.pdf | 91 kB | Shaun Ewing | Aug 22, 1969 00:00 |
|
Fastening Frames - Verification Outline | |||
| Version 1 (current) | 91 kB | Shaun Ewing | Aug 22, 1969 00:00 | Fastening Frames - Verification Outline | ||||
| PDF File 30-19A1_1969-08-22.pdf | 1.50 MB | Shaun Ewing | Aug 22, 1969 00:00 |
|
Erecting Frames - R-3447 - Floor Supported Hoisting Center | |||
| Version 1 (current) | 1.50 MB | Shaun Ewing | Aug 22, 1969 00:00 | Erecting Frames - R-3447 - Floor Supported Hoisting Center | ||||
| PDF File 30-19A1.1_1969-08-22.pdf | 464 kB | Shaun Ewing | Aug 22, 1969 00:00 |
|
Erecting Frames - R-3939 Floor Supported Heavy Duty Hoisting Center | |||
| Version 1 (current) | 464 kB | Shaun Ewing | Aug 22, 1969 00:00 | Erecting Frames - R-3939 Floor Supported Heavy Duty Hoisting Center | ||||
| PDF File 30-19C_1969-05-23.pdf | 481 kB | Shaun Ewing | May 23, 1969 00:00 |
|
Erecting Frames - Equipment and Cross-Connection Cabinets | |||
| Version 1 (current) | 481 kB | Shaun Ewing | May 23, 1969 00:00 | Erecting Frames - Equipment and Cross-Connection Cabinets | ||||
| PDF File 30-30V_1968-06-20.pdf | 142 kB | Shaun Ewing | Jun 20, 1968 00:00 |
|
Placing, Fastening and Aligning Switchboard Sections, Desks and Associated Parts - Verification Outline | |||
| Version 1 (current) | 142 kB | Shaun Ewing | Jun 20, 1968 00:00 | Placing, Fastening and Aligning Switchboard Sections, Desks and Associated Parts - Verification Outline | ||||
| PDF File 30-19F1_1965-12-16.pdf | 123 kB | Shaun Ewing | Dec 16, 1965 00:00 |
|
Erecting Frames - Shop Equipped Cable Duct Type Bays - Unequal Flange Upright Frames at Hoisting Center | |||
| Version 1 (current) | 123 kB | Shaun Ewing | Dec 16, 1965 00:00 | Erecting Frames - Shop Equipped Cable Duct Type Bays - Unequal Flange Upright Frames at Hoisting Center |