Unable to load page tree. It seems that you do not have permission to view the root page.
Attachments
| Name | Size | Creator | Creation Date | Labels | Comment | |||
|---|---|---|---|---|---|---|---|---|
| PDF File 30-40E_1981-08-14.pdf | 641 kB | Shaun Ewing | Aug 14, 1981 00:00 |
|
Rolling Ladders, Brakes and Ladder Track - 2A Brakes | |||
| Version 1 (current) | 641 kB | Shaun Ewing | Aug 14, 1981 00:00 | Rolling Ladders, Brakes and Ladder Track - 2A Brakes | ||||
| PDF File 30-20A2_1981-08-07.pdf | 120 kB | Shaun Ewing | Aug 07, 1981 00:00 |
|
Fastening Frames at Top of Frame - Sheet Metal Box Type | |||
| Version 1 (current) | 120 kB | Shaun Ewing | Aug 07, 1981 00:00 | Fastening Frames at Top of Frame - Sheet Metal Box Type | ||||
| PDF File 30-20A1_1981-06-19.pdf | 296 kB | Shaun Ewing | Jun 19, 1981 00:00 |
|
Fastening Frames at Top of Frame - Bulb Angle-Type | |||
| Version 1 (current) | 296 kB | Shaun Ewing | Jun 19, 1981 00:00 | Fastening Frames at Top of Frame - Bulb Angle-Type | ||||
| PDF File 30-20C_1981-05-08.pdf | 150 kB | Shaun Ewing | May 08, 1981 00:00 |
|
Junctioning - Sheetmetal Box, Bulb Angle, and Channel Frames | |||
| Version 1 (current) | 150 kB | Shaun Ewing | May 08, 1981 00:00 | Junctioning - Sheetmetal Box, Bulb Angle, and Channel Frames | ||||
| PDF File 30-53_UIS_1980-11-14.pdf | 50 kB | Shaun Ewing | Nov 14, 1980 00:00 |
|
Apparatus Mounting Screw Hole Punching with the R-3183 Sheet Metal Hand Punch | |||
| Version 1 (current) | 50 kB | Shaun Ewing | Nov 14, 1980 00:00 | Apparatus Mounting Screw Hole Punching with the R-3183 Sheet Metal Hand Punch | ||||
| PDF File 30-19E1_1980-10-24.pdf | 520 kB | Shaun Ewing | Oct 24, 1980 00:00 |
|
Erecting Frames, Job Assembled - Step-by-Step Frames | |||
| Version 1 (current) | 520 kB | Shaun Ewing | Oct 24, 1980 00:00 | Erecting Frames, Job Assembled - Step-by-Step Frames | ||||
| PDF File 30-6D_1980-09-19.pdf | 174 kB | Shaun Ewing | Sept 19, 1980 00:00 |
|
Laying Out Floors - Step-by-Step Office | |||
| Version 1 (current) | 174 kB | Shaun Ewing | Sept 19, 1980 00:00 | Laying Out Floors - Step-by-Step Office | ||||
| PDF File 30-50C_1980-07-21.pdf | 205 kB | Shaun Ewing | Jul 21, 1980 00:00 |
|
Mounting Equipment - Perforator Units and 14 Type Reperforators | |||
| Version 1 (current) | 205 kB | Shaun Ewing | Jul 21, 1980 00:00 | Mounting Equipment - Perforator Units and 14 Type Reperforators | ||||
| PDF File 30-52SE_UIS_1980-05-16.pdf | 34 kB | Shaun Ewing | May 16, 1980 00:00 |
|
Installation of Stud Mounted Semiconductor Devices | |||
| Version 1 (current) | 34 kB | Shaun Ewing | May 16, 1980 00:00 | Installation of Stud Mounted Semiconductor Devices | ||||
| PDF File 30-13B_1979-12-19.pdf | 704 kB | Shaun Ewing | Dec 19, 1979 00:00 |
|
Cable Racks - Assembly - Tubular Channel or Solid Stringer Construction - BSP 800-614-157 - Figures 2 Through 30 | |||
| Version 1 (current) | 704 kB | Shaun Ewing | Dec 19, 1979 00:00 | Cable Racks - Assembly - Tubular Channel or Solid Stringer Construction - BSP 800-614-157 - Figures 2 Through 30 | ||||
| PDF File 30-19B2_1979-09-21.pdf | 226 kB | Shaun Ewing | Sept 21, 1979 00:00 |
|
Erecting Frames - Sheet Metal Box Type Using R-2842 and R-3402 Dolly Truck | |||
| Version 1 (current) | 226 kB | Shaun Ewing | Sept 21, 1979 00:00 | Erecting Frames - Sheet Metal Box Type Using R-2842 and R-3402 Dolly Truck | ||||
| PDF File 30-11B_1979-09-07.pdf | 705 kB | Shaun Ewing | Sept 07, 1979 00:00 |
|
Auxiliary Framing - Low Type - Arrangement, Support and Bracing | |||
| Version 1 (current) | 705 kB | Shaun Ewing | Sept 07, 1979 00:00 | Auxiliary Framing - Low Type - Arrangement, Support and Bracing | ||||
| PDF File 30-10_1979-06-22.pdf | 823 kB | Shaun Ewing | Jun 22, 1979 00:00 |
|
Auxiliary Framing - High Type | |||
| Version 1 (current) | 823 kB | Shaun Ewing | Jun 22, 1979 00:00 | Auxiliary Framing - High Type | ||||
| PDF File 30-13D_1979-05-18.pdf | 653 kB | Shaun Ewing | May 18, 1979 00:00 |
|
Tubular Channel or Solid Stringer Construction - Cable Racks-Support - BSP 800-614-157 - Figures 62T, 62U, 65 to 89 | |||
| Version 1 (current) | 653 kB | Shaun Ewing | May 18, 1979 00:00 | Tubular Channel or Solid Stringer Construction - Cable Racks-Support - BSP 800-614-157 - Figures 62T, 62U, 65 to 89 | ||||
| PDF File 30-13C_1979-05-07.pdf | 651 kB | Shaun Ewing | May 07, 1979 00:00 |
|
Cable Racks - Assembly - Tubular Channel or Solid Stringer Construction - BSP 800-614-157 - Figures 31 Through 57G | |||
| Version 1 (current) | 651 kB | Shaun Ewing | May 07, 1979 00:00 | Cable Racks - Assembly - Tubular Channel or Solid Stringer Construction - BSP 800-614-157 - Figures 31 Through 57G | ||||
| PDF File 30-13A_1979-05-07.pdf | 792 kB | Shaun Ewing | May 07, 1979 00:00 |
|
Cable Racks - Tubular Channel or Solid Stringer Construction - General | |||
| Version 1 (current) | 792 kB | Shaun Ewing | May 07, 1979 00:00 | Cable Racks - Tubular Channel or Solid Stringer Construction - General | ||||
| PDF File 30-40D_1979-04-13.pdf | 611 kB | Shaun Ewing | Apr 13, 1979 00:00 |
|
Rolling Ladders, Brakes and Ladder Track - Track Type Rolling Ladders | |||
| Version 1 (current) | 611 kB | Shaun Ewing | Apr 13, 1979 00:00 | Rolling Ladders, Brakes and Ladder Track - Track Type Rolling Ladders | ||||
| PDF File 30-50G_1979-03-23.pdf | 476 kB | Shaun Ewing | Mar 23, 1979 00:00 |
|
Mounting Relay Rack Units, Fuse Panels, Mounting Plates and Similarly Mounted Equipment | |||
| Version 1 (current) | 476 kB | Shaun Ewing | Mar 23, 1979 00:00 | Mounting Relay Rack Units, Fuse Panels, Mounting Plates and Similarly Mounted Equipment | ||||
| PDF File 30-9A_1978-11-24.pdf | 241 kB | Shaun Ewing | Nov 24, 1978 00:00 |
|
Installing and Setting Self-Drilling Anchors | |||
| Version 1 (current) | 241 kB | Shaun Ewing | Nov 24, 1978 00:00 | Installing and Setting Self-Drilling Anchors | ||||
| PDF File 30-14_1978-04-01.pdf | 223 kB | Shaun Ewing | Apr 01, 1978 00:00 |
|
Equipment Handling and Assembly - Broadband Carrier Transmission Equipment - Installing Stanchions, Lineup Via and Cross-Aisle Cable Racks, (Broadband Cableway), Lighting End Guards, and Cabling | |||
| Version 1 (current) | 223 kB | Shaun Ewing | Apr 01, 1978 00:00 | Equipment Handling and Assembly - Broadband Carrier Transmission Equipment - Installing Stanchions, Lineup Via and Cross-Aisle Cable Racks, (Broadband Cableway), Lighting End Guards, and Cabling |